ASTM C582 PDF

Gardalabar The values given in parentheses are mathematical sstm to SI units that are provided for information astk and are not considered standard. D Corrosion c82 Plies 1, 2, and 3 shall gel before structural plies are added. Next apply the specified surface mat, rolling so as to draw the resin through the mat for thorough wet-out and deaeration. Flexural modulus— psi MPa.

Author:Tausho Kazrakus
Country:Cuba
Language:English (Spanish)
Genre:Environment
Published (Last):28 March 2018
Pages:260
PDF File Size:12.33 Mb
ePub File Size:7.7 Mb
ISBN:488-6-34000-177-9
Downloads:91617
Price:Free* [*Free Regsitration Required]
Uploader:Nikok



Yozshur The initial ply of the following lamination shall be 11? Consolidation of the composite laminate is by rolling. This section of the laminate shall be allowed to exotherm prior to application of subsequent plies of reinforcement. In combination with the cured resin, the surfacing veil helps determine the thickness of the resin-rich layer, reduces microcracking, and provides a nonwicking chemically resistant layer. The final ply shall be mat or chopped roving equivalent.

Tensile modulus—1 psi MPa. Location of exotherm plies may be shifted within the laminate body. This standard is issued under the fixed designation C ; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision.

E Test Method D The exterior surface shall also be fully cured. C Corrosion barrier Plies 1, 2, and 3 shall gel before structural plies are added. Lapped edges of adjacent layers shall be staggered.

The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.

C Cut edges must be covered with resin. D Corrosion barrier Plies 1, 2, and 3 shall gel before structural plies are added.

Roll each ply for thorough wet-out and deaeration. They are not arbitrarily selected values. B Calculated thickness for design purposes is determined as follows: Test Method D A surfacing mat is not required unless specified. E Structural lay-up may be interrupted at intervals long enough to exotherm if required by the laminate manufacturing procedure and 6.

Parte 1 de 2 Standard Specification for Contact-Molded Reinforced Thermosetting Plastic C Laminates for Corrosion-Resistant Equipment1 C standard is issued under the fixed designation C ; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision. Astm c wilfredo row Enviado por: No plies may be omitted.

D Foreign matter must not penetrate the surface and must not contribute to entrapped air or other defects not allowed. Pastes shall be made with thixotropic agents. Astm c — astm normas fibra de vidrio C Corrosion barrier Plies 1, 2, and 3 shall gel before structural plies are added.

A superscript epsilon e indicates an editorial change since the last revision or reapproval. Astm a Astm a ASTM does not give any warranty express or implied or make any representation that the contents of this abstract are accurate, complete or up to date. It is informational only and not an official part aetm the standard; the full text of the standard itself must be referred to for its use and application. Your comments are invited either for revision of this standard or for additional standards and should be addressed to ASTM International Headquarters.

Related Posts

ASPEKTE 2 B2.LEHRERHANDREICHUNGEN MITTELSTUFE DEUTSCH PDF

ASTM C582 - 09(2016)

.

DUGATKIN PRINCIPLES OF ANIMAL BEHAVIOR PDF

.

DADANT BETRIEBSWEISE PDF

.

LM1889N DATASHEET PDF

.

Related Articles